0% VAT on Energy-Saving Materials Ends March 2027: What You Need to Know
Heat pumps, solar, batteries, insulation and controls all qualify — here's how much you save, what changes in April 2027 and when to act
October 2026
The temporary 0% VAT rate on energy-saving materials is one of the most valuable incentives currently available to London homeowners. It applies to heat pumps, solar panels, battery storage, insulation and heating controls — and it ends on 31 March 2027. After that date, the rate rises to 5%. Combined with the Boiler Upgrade Scheme grant and the Warm Homes Loan, the period between now and March 2027 represents the maximum financial benefit window for energy upgrades.
What the 0% VAT Relief Covers
The zero-rate VAT treatment applies to the supply and installation of qualifying energy-saving materials in residential properties. The following products and systems are eligible:
- Heat pumps: Air source heat pumps (ASHPs) and ground source heat pumps (GSHPs)
- Solar photovoltaic (PV): Solar panels and associated inverters
- Battery storage: Home battery systems paired with solar or standalone
- Solar thermal: Solar hot water collectors
- Insulation: Cavity wall, loft, solid wall, floor and roof insulation
- Heating controls: Smart thermostats, zone controls, programmable timers
- Draught-proofing: Doors, windows and other openings
- Double and triple glazing: Where installed as part of an energy efficiency measure
The installation labour must be supplied together with the materials for the zero rate to apply. Standalone materials purchased without installation may attract the standard rate.
When It Ends: 31 March 2027
The 0% VAT rate is a temporary measure introduced by HMRC. It is scheduled to end on 31 March 2027, at which point the rate reverts to 5% (the reduced rate for energy-saving materials).
This is a firm legislative deadline. There is currently no indication from HM Treasury of an extension. Homeowners planning energy upgrades should treat 31 March 2027 as the definitive cut-off.
How Much You Save: Worked Examples
Here's what the difference between 0% and 5% VAT looks like in practice:
- Air source heat pump (£11,000 installation): At 0% VAT you pay £0 in VAT. At 5% you'd pay £550. Saving: ~£550
- Solar PV + battery (£10,000 installation): At 0% VAT you pay £0. At 5% you'd pay £500. Saving: ~£500
- Ground source heat pump (£20,000 installation): At 0% VAT you pay £0. At 5% you'd pay £1,000. Saving: ~£1,000
- Loft + cavity wall insulation (£3,000): At 0% VAT you pay £0. At 5% you'd pay £150. Saving: ~£150
- Combined heat pump + solar + battery (£22,000): At 0% VAT you pay £0. At 5% you'd pay £1,100. Saving: ~£1,100
These savings are in addition to any grants or loans available. They represent pure tax savings that disappear after the deadline.
BUS £9,000 Off-Gas Uplift Also Ends 31 March 2027
The enhanced Boiler Upgrade Scheme grant for off-gas homes is time-limited to the same deadline:
- Before 31 March 2027: Off-gas homes (oil or LPG) receive £9,000
- From 1 April 2027: All homes receive the standard £7,500 regardless of fuel type
For off-gas homeowners, this means losing £1,500 in grant value after the deadline. Combined with the VAT change, the total additional cost of waiting could be £2,000–£2,600 on a typical heat pump installation.
Read our full grants and funding guide for details on all available schemes.
Combined Saving: Maximum Benefit Window
The period between now and 31 March 2027 allows you to stack multiple incentives on a single project:
- Boiler Upgrade Scheme: £7,500 (or £9,000 off-gas) deducted from your invoice
- 0% VAT: Zero tax on the full installation cost
- Warm Homes Loan: No-/low-interest financing for the balance
Worked example — off-gas ASHP installation:
- Gross installation cost: £12,000
- BUS off-gas grant: −£9,000
- VAT at 0%: £0
- Net cost to you: £3,000
- Funded via Warm Homes Loan at ~£37/month over ten years
Same installation after April 2027:
- Gross installation cost: £12,000
- BUS standard grant: −£7,500
- VAT at 5% on £4,500: +£225
- Net cost to you: £4,725
- Difference: £1,725 more expensive
What Happens After April 2027
The incentive landscape changes but doesn't disappear:
- VAT: Rises from 0% to 5% — still a reduced rate, but no longer zero
- BUS grant: Remains at £7,500 for all homes (no off-gas uplift)
- Consumer Loan Scheme: A new government-backed consumer loan product launches in April 2027, designed to partially replace the introductory Warm Homes Loan rates. Details are still emerging.
- Warm Homes Loan: Expected to continue but potentially at higher interest rates than the introductory period
Heat pumps and energy upgrades remain financially attractive after April 2027 — the total incentive package is simply reduced by several hundred to over a thousand pounds depending on your circumstances.
Timeline: When to Book, Install and Complete
To guarantee your installation qualifies for both 0% VAT and the £9,000 off-gas BUS uplift, plan backwards from the deadline:
- November–December 2026: Book your free survey and receive your quotation. MCS-certified partners' diaries fill quickly ahead of the deadline — early booking secures your slot.
- January–February 2027: Design finalised, BUS voucher applied for, materials ordered. Allow 4–8 weeks from survey to installation start depending on installer availability.
- February–March 2027: Installation and commissioning completed. Typical ASHP installation takes 1–2 weeks; GSHP may take 2–4 weeks.
- By 31 March 2027: Installation complete, VAT invoice issued at 0%, BUS grant redeemed. The installation must be completed and invoiced before the deadline — not merely started.
We recommend booking your survey by December 2026 at the latest to allow sufficient time for design, procurement and installation before the deadline.
Planning Ahead Without Pressure
Deadlines create urgency, but good decisions shouldn't be rushed. Here's how to approach this sensibly:
- Get a survey now: Understanding your options costs nothing. A professional heat loss assessment tells you whether a heat pump is suitable and what the true cost will be.
- Compare properly: Obtain at least three itemised quotations. Check MCS certification, BUS eligibility and VAT treatment on each.
- Don't sacrifice quality for speed: A poorly installed heat pump will cost more in running costs and repairs than the VAT saving is worth. Choose competence over haste.
- If you miss the deadline: The 5% rate is still reduced, the BUS grant continues at £7,500 and the Consumer Loan Scheme provides alternative financing. The economics still work — just slightly less favourably.
Compliance & Certification
All our energy-saving installations comply with current regulations and scheme requirements:
We handle BUS applications, VAT documentation and Building Control notifications — you just sign the invoice.
Book Your Free Survey Before the Deadline
Tell us about your property and we'll confirm your BUS grant eligibility, VAT position and provide a detailed quotation — all before the 31 March 2027 deadline. No obligation.
Request Free QuoteWhy appoint us for your energy-saving installation?
M&E Direct Appointment
One point of responsibility from eligibility review through design and installation, with no layers of subcontracting between you and the project team.
Clear phased payments
Our appointments follow a 10% design, 60% materials and 30% completion structure, with 0% retention so there are no surprise deductions at handover.
Grant and VAT expertise
We navigate the BUS application, confirm 0% VAT eligibility and coordinate with loan providers so you maximise every available incentive.
Whole-system coordination
Heat pumps, solar, batteries and controls are planned as one integrated system — not separate installations by different contractors.
How an energy-saving installation project runs
Survey and eligibility check
We assess your property, confirm BUS grant eligibility, verify 0% VAT qualification and discuss financing options.
Design and quotation
System design is completed with a detailed quotation showing grant deductions, VAT treatment and staged payment schedule.
Installation and commissioning
All equipment is installed, tested and commissioned with full MCS and Building Control documentation completed.
Handover and aftercare
We explain your new system, provide warranty documentation and confirm all grant and VAT records are in order.
0% VAT deadline questions
What does the 0% VAT relief cover?
The 0% VAT rate applies to qualifying energy-saving materials installed in residential properties: heat pumps (air source and ground source), solar PV panels, solar thermal, battery storage, insulation (cavity wall, loft, solid wall), heating controls, draught-proofing and double/triple glazing. The installation labour must also be included in the supply for the zero rate to apply.
When does the 0% VAT rate end?
The 0% VAT rate on energy-saving materials ends on 31 March 2027. From 1 April 2027, the rate reverts to 5% (reduced rate). This is a firm deadline set by HMRC — there is no indication of an extension.
How much do I save with 0% VAT on a heat pump?
On an £11,000 air source heat pump installation, 0% VAT saves you approximately £550 compared to the 5% rate that applies from April 2027. On a £10,000 solar PV + battery system, the saving is around £500. These savings are in addition to the £7,500 Boiler Upgrade Scheme grant.
Does the BUS £9,000 off-gas uplift also end in March 2027?
Yes. The enhanced £9,000 Boiler Upgrade Scheme grant for off-gas homes (oil or LPG) is available until 31 March 2027. After that date, all heat pump installations receive the standard £7,500 grant regardless of fuel type. This means off-gas homeowners lose £1,500 in grant value after the deadline.
What happens after April 2027?
From 1 April 2027: VAT on energy-saving materials rises to 5%, the BUS grant remains at £7,500 (standard rate for all homes), and the new Consumer Loan Scheme launches to partially offset the loss of the Warm Homes Loan introductory rates. Heat pumps remain financially attractive but the total incentive package is reduced.
When should I book my installation to benefit from 0% VAT?
To guarantee completion before 31 March 2027, book your survey by December 2026 at the latest. MCS-certified partners' diaries fill quickly ahead of the deadline. Allow 4–8 weeks from survey to installation start, plus 1–2 weeks for the installation itself. Booking early also secures the £9,000 off-gas BUS uplift if applicable.